Our First Pilot Project

This project is the beginning of Terraco Earth's journey to decarbonize industrial emission. Proven Terraco Earth's technology in hard to abate sectors.

Tuas Waste-to-Energy Research Plant Pilot Project

Located in:

Tuas, Singapore

Commissioned at:

May 2025

Technical Specifications

Operating Temperature

30-35 C

Adsorption Pressure

1-9 Bar

95-99%

CO2 Removal Efficiency

Adsorption & Desorption Cycle controlled by PVSA system

Energy Consumption:

300KW

/ton CO2

Ideal for 8-15% CO2 in post-combustion flue gas

ABOUT THIS PROJECT

This is Terraco Earth’s very first pilot plant project, bridging successful trial into one step further to bigger scale application. This plant is designed to remove 1 ton CO2/day at maximum capacity from Waste-to-Energy Plant targeting post-combustion emissions to reduce carbon footprint from waste processing. This project validates the efficiency, reliability, and economic feasibility of our technology in an industrial setting.

With results gained from this pilot, Terraco Earth is poised to expand capacity, optimize operations, and deploy even larger systems, bringing us closer to a carbon-negative future.

birds eye photography of concrete structure
birds eye photography of concrete structure

Future Project Target

Waste-to-Energy

Petrochemical Complex

Power Plant

a large factory building next to a body of water
a large factory building next to a body of water

Cement Plant

Refineries

Steam Methane Reformer