Our First Pilot Project
This project is the beginning of Terraco Earth's journey to decarbonize industrial emission. Proven Terraco Earth's technology in hard to abate sectors.
Tuas Waste-to-Energy Research Plant Pilot Project


Located in:
Tuas, Singapore
Commissioned at:
May 2025
Technical Specifications
Operating Temperature
30-35 C
Adsorption Pressure
1-9 Bar
95-99%
CO2 Removal Efficiency
Adsorption & Desorption Cycle controlled by PVSA system
Energy Consumption:
300KW
/ton CO2
Ideal for 8-15% CO2 in post-combustion flue gas
ABOUT THIS PROJECT
This is Terraco Earth’s very first pilot plant project, bridging successful trial into one step further to bigger scale application. This plant is designed to remove 1 ton CO2/day at maximum capacity from Waste-to-Energy Plant targeting post-combustion emissions to reduce carbon footprint from waste processing. This project validates the efficiency, reliability, and economic feasibility of our technology in an industrial setting.
With results gained from this pilot, Terraco Earth is poised to expand capacity, optimize operations, and deploy even larger systems, bringing us closer to a carbon-negative future.






Future Project Target
Waste-to-Energy
Petrochemical Complex
Power Plant
Cement Plant